• Español
  • English
  • Technical and functional project executed by Cubic General Contractor

    At Cubic General Contractor, part of Grupo Cubic, we have carried out the space refurbishment for the MOAI brand, focused on the complete renovation of its corporate changing rooms.

    The project was developed over a surface of 125 square meters, with an execution period of 7 weeks, meeting the highest standards of quality, functionality and comfort.

    A technical environment transformed for daily use

    The main objective of this refurbishment was to transform an obsolete service area into a modern, accessible and durable space, designed for continuous and demanding use.

    • Controlled demolitions to remove deteriorated structural elements and finishes.

    • Redefinition of the layout, creating differentiated flows for users and maintenance personnel.

    • Optimisation of usable space, integrating cubicles, showers, benches and lockers with functional criteria.

    Durable materials and hygienic solutions

    Given the nature of the intended use, high-performance, low-maintenance materials were selected, capable of withstanding moisture, intensive use and the passage of time:

    • Anti-slip flooring and waterproof ceramic wall coverings.

    • Technical partitions, composite benches and phenolic elements.

    • Ventilation systems with constant air renewal to prevent condensation and bad odours.

    This choice of materials responds to both aesthetic and functional criteria, offering a clean, safe and visually harmonious environment.

    Complete upgrade of installations

    The space refurbishment at MOAI also included a complete intervention on the installations:

    • New electrical installation with dimmable LED luminaires.

    • New plumbing, including pipes, automatic tapware and linear drains.

    • HVAC and mechanical ventilation to ensure thermal comfort and humidity control.

    • Integration of access control systems and presence sensors.

    Each element was planned to comply with current regulations and guarantee a smooth and safe user experience.

    Efficient execution in just 7 weeks

    Thanks to detailed planning and demanding site management, the project was executed without deviations from the established schedule.

    • Weekly coordination between client, project management team and site supervision.

    • Supervision of technical trades and daily quality control.

    • Adaptation of construction details during the project without compromising deadlines.

    The punctual delivery allowed MOAI to activate the use of the space as planned, without interruptions to its operations.

    Result: modern, functional and durable changing rooms

    This project reaffirms the capacity of Cubic General Contractor to deliver, with full reliability, specialised interior refurbishment projects oriented towards comfort, operational efficiency and durability.

    The new MOAI changing rooms represent a renewed environment, designed to meet the current needs of users and remain in perfect condition for years.