• Español
  • English
  • Functional and aesthetic fit-out project for a wellness centre

    At Cubic General Contractor, part of Grupo Cubic, we have executed the commercial fit-out for HELTIA, a new space dedicated to health and wellness located on Pau Claris, Barcelona.

    With a total surface of 118 square meters and a construction period of 6 weeks, the project was developed with a precise technical approach, elegant design and strict regulatory compliance.

    A commercial space transformed for specialised healthcare use

    The project required a complete intervention to turn a raw space into a functional environment for HELTIA’s activity, with specific requirements linked to its healthcare and therapeutic use.

    • Interior redistribution with multipurpose rooms, reception, private areas and adapted facilities.

    • Compliance with healthcare regulations and universal accessibility.

    • Fluid design between the different zones of the user journey.

    The transformation focused on creating a serene, professional and comfortable atmosphere.

    High-quality finishes and minimalist design

    HELTIA’s interior design combines a clean and contemporary aesthetic with warm and hard-wearing materials:

    • Seamless flooring and technical wall coverings that are easy to maintain.

    • Indirect lighting and natural light as the focus of visual comfort.

    • Neutral colour palette with predominant whites, soft greys and details in light wood.

    This approach enhances a sense of calm and order, aligned with the brand’s values.

    Installations adapted to intensive and professional use

    As part of the complete fit-out, the following technical installations were carried out:

    • Zoned HVAC and air renewal systems.

    • Low-consumption LED lighting with room-by-room dimming control.

    • Sectorised electrical system and integrated data network.

    • Complete plumbing with adapted sanitary installation and water-efficiency systems.

    The entire technical system was designed to guarantee comfort, efficiency and operational durability of the space.

    Efficient execution and turnkey delivery

    The project was executed in just 6 weeks, rigorously meeting the agreed deadlines. This was possible thanks to:

    • Weekly planning with the client and the project management team.

    • Precise coordination of all trades.

    • Daily site supervision and thorough quality control of finishes.

    The project was delivered fully operational, ready for commercial activity to begin.

    Result: a functional, modern space aligned with the HELTIA experience

    This commercial fit-out demonstrates the ability of Cubic General Contractor to create spaces that combine functionality, regulatory compliance, brand image and user experience.

    HELTIA Pau Claris is today a professional, warm and efficient environment, ready to offer wellbeing from its very architecture.

    C. De la Ciutat d'Elx, 19
    08027 Barcelona
    © 2026 – CUBIC CORP, S.L